The contract works involved the high pressure water blasting (10,000 PSI) and application of Rapid Repair & Armor to the following concrete structures: Distribution channel, Bypass channel, Screen chamber, Screen chamber discharge channel.
With the project needing to be carried out within the operational treatment plant, in a staged approach, it was critical to be able to repair the damage without disrupting the plant during that time.
Rapid Repair takes just 17 minutes to set allowing for the rapid application of the product with minimum disruption. By fixing the existing structure, without impending the operation of the plant the Timaru Council was able to save money both operationally and forgoing replacement of the existing structure.